EASTERN MINING CORPORATION
The exceptional craftsmanship that you deserve
+237 688384773
PROJECTS

ESEKA GOLDFIELD PROJECT
The Eseka gold project is located within the Centre Region which geologically lies within the 150 kilometre long Eseka greenstone belt.Â
The Eseka greenstone belt comprises mafic-ultramafic and felsic volcanic rocks intruded by granitoids. Â
A regional crustal scale shear zone, the Main Transcurrent Shear Zone (MTZ) with a northeast-southwest trend, exploits the lithological contact between the supergroups and is the host structure to mineralisation at MEseka.
EMC controls the groundholding over more than 50% of the strike extent of this very prospective belt.

BATOURI MINING PROJECT
Batouri town is 420km east of Yaoundé, the Country’s capital. It is a divisional capital with shops, hotels, and a hospital
It takes approximately 6 hours to drive to the project on tarmac and maintained laterite roads. Access within the licence is by 4×4 tracks and forestry roads
The project has good mobile phone coverage, a dedicated satellite link for data and email, and three-phase electrical power.
